Bridge Stride

2016-stride-map

View larger printable map ›

Description A five mile walk over the Fremont and Steel bridges.
Bridges crossed
(in order)
Fremont and Steel
Distance 5 miles
Start SW Naito Parkway and Ash
Finish SW Naito Parkway and Ash
Notes Access Google map of route


Age

Cost

Youth (age 17 and younger) $15.00
Adult (age 18 - 59) $25.00
Senior (age 60 and over) $20.00


Bridge Stride turn-by-turn instructions

Start 8 a.m.

Start: SW Naito and Ash
SW Naito Northbound
Left on SW Davis (sidewalk)
Right on NW Park Place (sidewalk)
Left on NW Glisan (sidewalk)
Right on to Glisan Street off ramp from I-405
Fremont Bridge
Kerby Street off ramp from bridge
        Rest stop
South on N. Vancouver (sidewalk)
Right on N. Russell (sidewalk)
Left on N. Flint (sidewalk)
Right N. Broadway (sidewalk)
Left on N Larrabee (sidewalk)
Left on N Interstate (sidewalk)
Right on NE Oregon (sidewalk)
Steel Bridge (sidewalk)
Right on NW Naito (sidewalk)
Finish: SW Naito and Ash